
Design and build, A to Z
From the idea and technical drawings through structure and interiors. You receive the keys, without chasing materials or supervising every trade.
Architecture, construction and interiors — one contractor

More than 10 years building homes in Vietnam
Turnkey residential design and construction, from first sketch to handover. We turn the home you imagine into a finished place you can trust.

Built to last
Trust us with a home that feels complete
An Phat is a specialist in residential design and construction. For more than ten years we have worked with families across Vietnam. A house, to us, is more than shelter. It is the place you come home to, where everyday moments stay, and a quiet sign of what the owner has built.
Clients can hand the whole home over to An Phat. The process is written down, the costs are visible, and the team stays with the project from the first meeting to handover.
Finished in one sequence, from A to Z
Complimentary advice, included
“An and Phat — a settled home, and the means to prosper — guide the company. An Phat keeps raising the standard of its craft so each Vietnamese family has a home that is sound, and a base they can build on.”
Architecture · Construction · Interiors
One team for the whole house, so you are not left coordinating drawings, materials and crews on your own.

From the idea and technical drawings through structure and interiors. You receive the keys, without chasing materials or supervising every trade.

The entry, kitchen, altar and floor plan are reviewed with the owner’s birth year before the design is fixed.

A live line when the site needs a decision. Issues on site are dealt with the same day, so the work does not sit idle.

The material schedule is attached to the contract. A standard option and a higher specification, so the budget stays yours to set.

A site diary and a sign-off at each stage. The programme does not drift because people or materials failed to show up.
A first layout and a free estimate, before you commit.
A look at homes An Phat has drawn and built.
Five steps, so time and budget stay visible from the start.
Step 1
We take the brief, measure the site, and offer feng shui advice on the property itself.
Step 2
A first 2D and 3D set, then a line-by-line estimate for each part of the work.
Step 3
Programme, material schedule and warranty terms are agreed before work starts.
Step 4
Building proceeds with daily technical supervision and a written site diary.
Step 5
You receive the keys, a walkthrough, and scheduled aftercare.